Service

Hardscaping & Pavers

Patios, walkways, steps and walls built on proper base for long‑term performance.

What’s included

  • Compacted AB‑3 base & geotextile
  • Edge restraint & polymeric sand
  • Laser‑set grades & drainage focus
  • Lighting & seating options

Get a price

Specifications we follow

  • 4–6″ compacted base (more for clay/traffic)
  • Slope 1/8–1/4″ per foot away from structures
  • Color‑matched edge restraint
  • Joint stabilization with polymeric sand

Timeline & Prep

We’ll confirm utilities, access and materials ahead of your start date. Weather may shift schedules slightly, but we’ll keep you posted. All work backed by our 1‑year workmanship guarantee.

FAQ

How long does a patio take?

Small patios: 2–3 days; larger with steps/walls: 4–7+ days.

Concrete vs pavers?

Concrete is cost‑effective; pavers offer repairability and design options.

Before & After

Before
After